The 2026 election is over (November 3). Official results are on the Colorado Secretary of State’s website.
Kim MonsonKim Monson · Colorado Voter's Guide 2026
Holyoke School District RE-1J
5A

Permission for the Holyoke school district to take a smaller state grant as the match for bonds approved in 2024

Accepting a grant
Allows a $37,511,924.54 state grant to match the bonds voters approved in 2024 for a new elementary school. The grant is smaller than the amount required by the original bond measure.
Holyoke School District RE-1J
On the November 3, 2026 ballot
Kim's Recommendation
NO
Vote No on Holyoke School District RE-1J Ballot Question 5A

Question 5A names one number, the $37,511,924.54 grant, and calls it money the district need not repay. No figure a Holyoke property owner would pay appears in its words. The 2024 text tied up to $14.84 million of new debt to a grant above $42 million, and 5A asks to accept $37.5 million as the match for that debt. I read a yes, then, as the vote that would let the district borrow that sum and raise taxes by up to $1.4 million a year to repay up to $28 million.

The question describes those bonds as "already passed by voters in 2024," yet at a $37.5 million grant the 2024 text lets none of them be issued. I will not support borrowing and a property tax increase that reach the ballot only as a grant.

I recommend a no vote on Holyoke School District RE-1J Ballot Question 5A.

Kim Monson
Kim Monson
Host, The Kim Monson Show · President, Colorado Union of Taxpayers · Colorado Voter's Guide 2026
Certified ballot question

Shall Holyoke School District RE-1J be permitted to accept the guaranteed award amount of $37,511,924.54 in "BEST" grant funds (which are not required to be repaid) as a match for the issuance of general obligation bonds already passed by voters in 2024 to build and furnish a new elementary school?

A yes vote means

Allows the district to accept the $37,511,924.54 BEST grant as the match for the 2024 school bonds. The grant does not have to be repaid.

A no vote means

Denies permission to use this grant as the match. It does not repeal the 2024 bond authorization.

A Grant Below the Bond Condition01

On August 20, 2024, the Holyoke school board approved the wording of Ballot Issue 5K, a school bond question. As the board adopted it, the question let the district borrow up to $14.84 million, with a repayment cost of up to $28 million and a district tax increase of up to $1.4 million a year. The increase in debt was "to occur only if" the district received more than $42 million from Building Excellent Schools Today, or BEST, the state's school construction grant program. The district's grant application says voters passed that bond in November 2024.

The grant the state has recommended is $37,511,924.54. Question 5A asks whether the district may accept that "guaranteed award amount" as the match for issuing general obligation bonds "already passed by voters in 2024 to build and furnish a new elementary school." The ballot says the grant funds are not required to be repaid. Voters in Holyoke School District RE-1J decide; the question appears on the Phillips County, Sedgwick County and Yuma County ballots.

Unlocking the Approved Bonds02

The 2024 condition is a grant that "EXCEEDS $42 MILLION." The $37.5 million award does not meet it, so by its terms the 2024 authority allows no new borrowing at this award. The 2026 question asks permission to use the smaller award "as a match for the issuance of" the 2024 bonds; it does not mention the $42 million condition, and it prints no debt, repayment or tax figure. Read together, the two texts make a yes on 5A the step that would let the district issue the bonds, within the 2024 limits, and levy the tax to repay them.

The 2024 question lets the district levy property taxes "WITHOUT LIMIT AS TO THE MILL RATE" to repay the bonds, and lets it keep and spend that revenue above other annual limits from the date the bonds are issued until their final maturity. Neither question prints a final repayment year.

A no vote does not repeal the 2024 authorization. Its condition of a grant above $42 million would still apply, so under its text the bonds could not be issued with the $37.5 million award. The same state list ranks backup projects "in the event an awarded project fails to secure matching funds." On the state's list, an asterisk beside Holyoke's name leads to a note that reads, "Grants are contingent upon a November 2026 Bond Election."

The district's application lists $1,595,000 in outstanding bonded debt, and the state's 2025 property tax records show a bond levy of 3.021 mills within the district's total levy of 30.024 mills.

The State's Share of the Project03

Holyoke's replacement elementary school ranks third among the BEST grants the state recommended for 2026-27. The state's list pairs the $37,511,924.54 grant with a local contribution of $14,840,000, for a project request of $52,351,924.54.

The state sets Holyoke's minimum local share at 36%. The application offers 28.3% and marks a waiver letter as required. The district says it has cut about $2 million from the project budget in response to feedback from the state and the Capital Construction Assistance Board.

The application counts 274 pupils in the project, at $191,065 each. The Department of Education's October pupil counts for the district fell from 594 in 2015-16 to 519 in 2025-26.

Grant and local funding
FundingAmount
BEST grant$37,511,924.54
Local contribution$14,840,000.00
Total project request and match$52,351,924.54
Colorado Department of Education, FY2026–27 BEST grant list and Holyoke application. These are the listed project funding amounts, not a final construction cost or total bond repayment.
A Failing Elementary School04

According to the district's application, Holyoke Elementary School was built in 1954 and later expanded four times. The district cites a 2024 state facility assessment finding that 93% of the building's systems are failing or require correction within five years. It reports that crushed utilities under the concrete slab have caused recurring flooding, gas leaks, electrical fires and prolonged building closures, and that failed stormwater pipes under the library left a sinkhole that cracked the slab and foundation.

The district proposes building the replacement school at the junior/senior high school site, creating one K-12 campus.

Campaign support and opposition05
TRACER filing, October 28, 2026
Sources06
Official documents
Further reading
Official documents
Local government records
Campaigns and committees
Reference

The 2026 election is over. Requests for personalized guides closed on November 3, 2026. The full guide remains available to read.

Read the full guide